Start with one roof-area list
- Main slopes, additions, porches, low-slope sections, garages, and outbuildings
- Chimneys, skylights, walls, valleys, vents, solar, and rooftop equipment
- Gutters, snow retention, fascia, soffits, and drainage
- Known leaks, repairs, access restrictions, and occupied areas
Normalize the assembly
| Scope area | Compare |
|---|---|
| Removal | Layers, tear-off, disposal, protection |
| Substrate | Inspection, included repair, unit prices, authorization |
| Water control | Underlayment, ice protection, flashings, transitions |
| Roof covering | Exact product/profile, fastening, accessories |
| Ventilation | Existing condition, proposed intake/exhaust, exclusions |
| Completion | Cleanup, permits, photos, inspections, warranty documents |
Find open-ended cost
Mark every allowance, unit price, “as needed” item, exclusion, owner responsibility, and undefined product. Ask each company the same clarification questions and keep written answers with the proposal.
Compare the company and contract
- Exact contracting entity and current documents
- Relevant experience with the proposed system
- Crew and subcontractor responsibilities
- Schedule and weather assumptions
- Payment and change-order terms
- Manufacturer versus workmanship coverage
- Cancellation, dispute, and cleanup provisions
Two estimates are only comparable when they describe the same work
This is the single most useful hour you can spend on a roofing project. A homeowner comparing two numbers is usually comparing two different projects, and the gap between them is rarely the contractor's margin — it is scope. The exercise is not adversarial; a good company will welcome a scope comparison because it is how they demonstrate what they included.
Ask each bidder the same written questions and compare their answers side by side. Where one has an answer and the other has a shrug, that difference is worth more than a few hundred dollars on the total.
| Line | What to compare | Why the totals move |
|---|---|---|
| Measured roof area | Squares, and how they were measured | A satellite measurement can miss planes, additions, and low-slope sections |
| Layers and tear-off | How many existing layers, and whether all come off | A layer-over hides the deck and changes the whole project |
| Deck allowance | Included quantity and unit price beyond it | The largest single source of change orders |
| Ice protection | How far up from the eave, and in valleys | A genuine performance difference in this climate |
| Underlayment | Type across the remaining field | Cheap to downgrade, invisible once covered |
| Flashing | New step flashing, or reused; counter flashing | Reused flashing is where a new roof leaks first |
| Ventilation | Intake and exhaust as a designed pair | Exhaust without intake makes attic moisture worse |
| Disposal and protection | Dumpster, landscaping, magnet sweep, permits | Excluded items reappear as cost or as your problem |
| Warranty | Manufacturer system versus installer workmanship | Two different things with different durations and exclusions |
What a low number usually means
It is rarely a scam. Far more often a lower price is a genuine reflection of a thinner scope: fewer squares measured, ice protection at the code minimum rather than past the wall line, reused step flashing, no allowance for decking, standard underlayment, and disposal treated as an extra. Every one of those is a defensible choice — as long as you know you are making it.
The version worth walking away from is the one that will not put the scope in writing. A company unwilling to state the price form, the dates, the materials, and the change-order process is declining to give you the things Vermont law requires in a residential contract at or above $10,000 anyway.
- Ask every bidder to price the same written scope, not their own version of it
- Get the deck allowance and unit price in writing from each
- Check whether flashing is new metal or reused
- Confirm ice protection extends past the interior wall line
- Confirm disposal, permits, and cleanup are included rather than assumed
Published August 13, 2026 and last reviewed August 16, 2026 by Greater Burlington Roofing. General roofing information; an on-site inspection is required for property-specific recommendations.